Projects Under Design

Priority

Project Number

Project

Architect
/Engineer

Date
Rec'd

Date
Est.

Date
Fund

Proj.
Budget

Cost
Est.

Sq.Ft.

COST/
Sq.Ft.

Remarks

  BF-06-12 Renovate Labs 225-243, Murphy Bldg. Widener               On-Hold
  CJ-06-30 Renovate Part 3rd Floor Standardized Patient Care, Pavilion III Virgo/Gambill         1,190,035 6182 175 Programming Completed
  CB-07-01 Renovate Labs 3501 through 3545, R&E Bldg.   6/06     999,000 770,000 4200 183 Waiting Funding
  CH-07-03 Renovation of CH Building   7/06     1,121,120 910,000     On-Hold
  XT-07-04 Demolition of AI, AJ, AE, & AL Buildings         285,186 220,000     Demolition by HI in July
  HS-07-13 Replace HVAC 1st & 2nd Floors. Annex Plant       780 780      
  AE-07-17 Replace Windows, Pavilion I Studio 3 Design         215,368     Not Funded-On Hold
  CN-07-19 Build-out 2nd Floor, Cancer Research Center LAS       5,995,000 4,956,000 25,000 197 Schematic Design
  OB-07-25 Addition to Vivarium                 On-Hold
  CB-07-37 Renovate Lab 3515, R & E Building 2KM Architects 2/07 7/07 9/07 71,400 71,400 1200 60 Designing
  FI-07-39 Renovate Alumni Center Studio 3 Design 4/07             On-Hold
  HM-07-40 Renovate HM Bldg for Pharm. D Program Virgo/Gambil     12/07 739,200 600,000 7200 83 Issuing Contract
  EC-07-42 Renovate Room 144 For Lab Jay 6/07             Waiting User Input
  OB-08-01 Resurface Querey Tile Floor Vivarium Rinker 6/07     50,000 50,000     Out For BID
  BC-08-02 Reroof Auditoria  Center-Design   6/07     19,000 19,000     Design Funding Pending
  HS-08-03 Reroof Annex Bldg-Design   6/07     39,000 39,000     Design Funding Pending
  XT-08-04 Laney Walker Pedestrian Study Ward 6/07     42,000 42,000     Pending Traffic Study
  HS-08-05 Replace HVAC System 2nd Floor-Annex Bullock 7/07              
  CH-08-06 Replace HVAC System, CH Bldg. Bullock 7/07             On-Hold
  BR-40-0801 Upgrade Fire Sprinkler System, R&E Bldg. Yakamovich 7/07             Awarding Contract
 
EB-08-15 Replace Fan Coils, Jennings Bldg. Bullock   8/07 8/07 350,000 350,000     Combine with EB-08-17
  EB-08-17 Renovate First Floor for DHI, Jennings Bldg. Bangs   8/07 8/07 513,155 513,155 6800 75 BID Open 2/19/08
  BG-08-18 Renovate Animal Area, Dugas 2KM Architects 8/07       600,000      
  EC-08-19 Renovate Classroom 2210, Health Sciences Bldg.   8/07             Study
  XT-08-20 Cardkey Upgrade Phase II, Various Locations Yakamovich 9/07 12/07   225,000 218,000      
  AA-08-21 Renovate Cashier's Office, Administration Building   9/07             Study
  CB-08-22 Renovate 2735 for Offices, R&E Bldg.   9/07             Waiting Approval
  AA-08-23 Renovation of Dean's Office, SOM Harley 9/07 9/07           Designing
  AA-08-24 Renovate Lobby Administration Bldg. Harley 9/07 9/07           Designing
  XT-08-25 Demolish Various Building   10/07             On-Hold
  CB-08-26 Renovate 1600 Area HERA 10/07             Designing
  EC-08-27 Health Sciences Bldg. Fire alarm System Up-grade EDC 10/07             Waiting Funding
  CN-08-28 Confocal Microscope Rm. 4121, CRC Pruett Ford 10/07              
  AB-08-29 Renovate Rooms 146, 164, 166, 149, Library Chastain 10/07 11/07 11/07 50,000 50.000     Being done on IDR.
  AD-08-30 Paging & Clock System, School of Dentistry Yakimovich 10/07             Waiting Estimate
  CA-08-31 Renovate Rooms  2059/2064, IRC Bldg.         288,904 234,500 1876 125 Revising
  BR-40-0607 Second Floor Build-Out, CRC Lord Aeck Sargent       5,829,000 4,909,000 25,000 197 Schematic Design
  AB-08-39 Renovate Library   10/07     7,897,954 6,527,235 39,559 165 Waiting Approval
  XT-08-33 Site Study, Gilbert Manor Brookwood 1/08 1/08   38,500        
  CN-08-34 Renovate Copy Room for Microscope   1/08             Developing Program
  CB-08-35 Renovate Lab 3712, R&E Bldg.   1/08     233,390 189,440 1024 185  
  CB-08-36 Renovate Lab 2915, R&E Bldg.   1/08     258,461 210,000 1134 185  
  CJ-08-37 Renovate 3rd Floor for SPC Simulation   1/08              
  CL-08-38 Renovation Hamilton Building   1/08              
  AD-08-32 Back-Fill Study, School of Dentistry HEERY 1/08 1/08 2/08 39,960 37,960      
  CN-08-40 Microscope Rm 3142, Cancer Research Center   1/08 2/08   25,000        
  OB-08-41 Expansion of Animal Services, Graceewood   2/08              
  XT-08-42 Decision Option Study Gleeds 1/08 1/08   40,000        
  XT-08-43 Environmental & Topographic Sruvey Granston 1/08 1/08   30,000        
  CM-08-44 Capacity Study, South Energy   1/08 1/08   10,000        
  XT-08-45 Old Medical College Review Lord Aeck Sargent 1/08 2/08   57,000 57,000      
  XT-08-46 Peer Review, SOM Expansion Program Lord Aeck Sargent 1/08 2/08   39,000 39,000      
  AD-08-47 Renovate Lecture Rooms 2001 & 3001, School of Dentistry   2/08              
  J-132 New School of Dentistry LAS