AA-04-01 Renovate Rooms 315, 317 & 319, Administration Bldg Bangs J. H. Cleveland   3/1/08 99 97   112,150 503 223  
AE-07-29 Renovate1st Flr Biostastics, Pavilion I 2KM Architects KR-Witwer, Inc.         539,616 316,201 13,000 25 Awarding
BC-07-27 Renovate Large Auditorium Studio 3 Design R. W. Allen 8/1/07 2/27/08 99 90 1,111,968 670,000      
BC-07-31 Auditoria Center Lobby Renovation Studio 3 Design R. W. Allen 8/1/07 2/27/08 99 90 542,600 502,100      
BR-40-0501 Renovate 1100 & 1200 Area, R & E Building Matrix 3D J. H. Cleveland 9/7/06 5/30/07 95 95 2,809,379 1,526,831 12450 123  
BR-40-0701 Data Center Platform Expansion, Annex Bldg. CompuCraft CompuCraft 12/07 5/08     3,906,500        
CA-07-41 Fish Room, IRC S&G Engineering J. H. Cleveland         186,300 117,880 1300 91 Awarding
CB-07-05 Repairs Basement Floor Bangs J. H. Cleveland 3/22/07 7/22/07 95 100 100,000 29,000      
EB-08-17 Renovate First Floor for DHI, Jennings Bldg. Facilities Planning Eddins Electric 3/10/08 5/26/08     863,000 489,000 6800 72  
HF-07-36 Fire Protection update, Bldg HF Dickinson Gaskin Const. 2/4/08 6/30/08       214,000      
HS-07-11 Computer Platform HVAC Upgrade, Annex Bullock           200,000 200,000      
XT-06-32 Install Security on Telecom Rooms, Various locations Nicholas Dickinson Johnson Control 5/10/06 3/30/07 100 90 320,000 320,000      
XT-07-02 Fire Alarm Pavilion I, II, & Auditoria EDC                    
XT-07-18 Campus Master Plan Update SBRA         50